Electric generating plantEIA plant no. 66129

Dover Solar and Battery Storage

Type
Solar Photovoltaic
Nameplate capacity
40.0 MW
Units
2
In service since
2023–2024
Operator
Tampa Electric Co
Location
Dover, Hillsborough County, Florida
Rated 261st largest in Florida · 4259th of 14,761 in the U.S. · by nameplate

Dover Solar and Battery Storage is a solar power plant in Florida with a nameplate capacity of 40.0 MW. It generates roughly 2.0k MWh per year — enough to power about 186 average U.S. homes.

Its capacity factor of 1% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Dover Solar and Battery Storage could make 219.0k MWh. In 2023 it made 2.0k MWh — the same as running at full power less than 1 hours in every 100.

Nameplate, full year219.0k MWh25.0 MW × 8,760 hours
Actually generated2.0k MWhEPA eGRID, 2023 · ≈186 homes

In 2023 its nameplate was 25.0 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 40.0 MW operating.

Peaking or variableCapacity factor 1%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomassBattery Storage

Location

Address1255 Sydney Washer Rd
CityDover
CountyHillsborough County
StateFlorida
ZIP33527
Coordinates27.95586, -82.20138
OperatorTampa Electric Co

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar25.0 MWOperating2023
BESS1BatteriesBattery15.0 MWOperating2024

Grid context

NERC RegionSERC
Balancing AuthorityTampa Electric Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Hillsborough County

View all plants in Hillsborough County →

Data centers near Dover Solar and Battery Storage

Data centerOperatorDistance
Cyxtera Tampa TP1Cyxtera9.2 mi
Flexential Tampa - NorthFlexential13.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map