DTE Atlantic, LLC is a natural gas power plant in New Jersey with a nameplate capacity of 7.5 MW. It generates roughly 55.3k MWh per year — enough to power about 5,270 average U.S. homes.
Its capacity factor of 84% means it runs nearly around-the-clock as baseload generation. At 1352 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, DTE Atlantic, LLC could make 65.7k MWh. In 2023 it made 55.3k MWh — the same as running at full power 84 hours in every 100.
BaseloadCapacity factor 84%. It runs nearly around the clock.
How it works
Why the numbers look like this: a combustion turbine can go from cold to full power in well under an hour, often minutes, so grid operators call on these plants for the few hottest or coldest hours of the year. A low capacity factor here is the job description, not a failure.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1077 Absecon Blvd |
|---|---|
| City | Atlantic City |
| County | Atlantic County |
| State | New Jersey |
| ZIP | 08401 |
| Coordinates | 39.37330, -74.43690 |
| Operator | DTE Atlantic, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| ACB-1 | Natural Gas Fired Combustion Turbine | Natural Gas | 7.5 MW | Operating | 2010 |
| CO₂ | 37.4k metric tons |
|---|---|
| SO₂ | 1 metric tons |
| NOₓ | 102 metric tons |
| CO₂ Rate | 1352 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| GlobeNet Tuckerton Cable Landing Station | 17.4 mi |
| AT&T Tuckerton Cable Landing Station (TAT-14) | 17.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map