Easton Csg 1 Llc

☀ SolarIPP Non-CHP3 MW capacity

179th largest plant in Maine · 8944th nationally

Easton Csg 1 Llc is a solar power plant in Maine with a nameplate capacity of 3.3 MW.

Capacity3 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameEaston Csg 1 Llc
OperatorEaston Csg 1 Llc
CityEaston
CountyAroostook County
StateMaine
ZIP04740
Coordinates46.64325, -67.90871

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
ESTONSolar PhotovoltaicSolar3.3 MWOperating2024

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Aroostook County

View all plants in Aroostook County →