Electric generating plantEIA plant no. 59134

Easton Landfill

Type
Solar Photovoltaic
Nameplate capacity
1.6 MW
Units
1
In service since
2013
Operator
CleanCapital Holdings
Location
Easton, Bristol County, Massachusetts
Rated 537th largest in Massachusetts · 12534th of 14,761 in the U.S. · by nameplate

Easton Landfill is a solar power plant in Massachusetts with a nameplate capacity of 1.6 MW. It generates roughly 2.2k MWh per year — enough to power about 212 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Easton Landfill could make 14.0k MWh. In 2023 it made 2.2k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year14.0k MWh1.6 MW × 8,760 hours
Actually generated2.2k MWhEPA eGRID, 2023 · ≈212 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBattery Storage

Location

Address114 Prospect Street
CityEaston
CountyBristol County
StateMassachusetts
ZIP02375
Coordinates42.01028, -71.09222
OperatorCleanCapital Holdings

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
57449Solar PhotovoltaicSolar1.6 MWOperating2013

Ownership

OwnerLocationShare
GLC-(MA) Easton, LLCSacramento, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Bristol County

View all plants in Bristol County →

Explore more