Electric generating plantEIA plant no. 56696

Eltopia Branch Canal 4.6

Type
Conventional Hydroelectric
Nameplate capacity
2.2 MW
Units
1
In service since
1983
Operator
Columbia Basin Hydropower
Location
Pasco, Franklin County, Washington
Rated 127th largest in Washington · 10933rd of 14,761 in the U.S. · by nameplate

Eltopia Branch Canal 4.6 is a hydroelectric power plant in Washington with a nameplate capacity of 2.2 MW. It generates roughly 8.7k MWh per year — enough to power about 827 average U.S. homes.

Its capacity factor of 45% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Eltopia Branch Canal 4.6 could make 19.3k MWh. In 2023 it made 8.7k MWh — the same as running at full power 45 hours in every 100.

Nameplate, full year19.3k MWh2.2 MW × 8,760 hours
Actually generated8.7k MWhEPA eGRID, 2023 · ≈827 homes

Mid-meritCapacity factor 45%. It runs much of the time, but not all of it.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearHydroelectricWindSolar

Location

Address2481 Hooper Road
CityPasco
CountyFranklin County
StateWashington
ZIP99301
Coordinates46.37838, -119.25452
OperatorColumbia Basin Hydropower

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Conventional HydroelectricWater2.2 MWOperating1983

Ownership

OwnerLocationShare
Quincy-Columbia Basin Irr DistP.O. Box 188 Quincy, WA3334.0%
East Columbia Basin Irr DistOthello, WA3333.0%
South Columbia Basin Irr DistPasco, WA3333.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityBonneville Power Administration

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Franklin County

View all plants in Franklin County →