ERock MID Claribel Generation Station is a natural gas power plant in California with a nameplate capacity of 48.0 MW.
The 48.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1762 Claribel Rd |
|---|---|
| City | Modesto |
| County | Stanislaus County |
| State | California |
| ZIP | 95356 |
| Coordinates | 37.71027, -120.96854 |
| Operator | Enchanted Rock |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| MID | Natural Gas Internal Combustion Engine | Natural Gas | 48.0 MW | Operating | 2024 |
| Owner | Location | Share |
|---|---|---|
| California Dept. of Water Resources | Sacramento, CA | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | WECC |
|---|---|
| Balancing Authority | Balancing Authority of Northern California |
Natural gas plants are the workhorse of the modern grid. Combined-cycle units achieve very high efficiency and can ramp up and down quickly to balance variable renewables. They emit roughly half the CO₂ per MWh of coal and far less of other pollutants, but they still release upstream methane during fuel extraction.
| Data center | Distance |
|---|---|
| Modesto Junior College West Data Center | 5.0 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map