Estonian Solar Project, LLC is a solar power plant in Texas with a nameplate capacity of 305 MW.
The 305 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 2276 Fm 2949 |
|---|---|
| City | Cooper |
| County | Delta County |
| State | Texas |
| ZIP | 75432 |
| Coordinates | 33.45714, -95.66790 |
| Operator | Enel Green Power Estonian Solar Project, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| SOLAR | Solar Photovoltaic | Solar | 205 MW | Operating | 2025 |
| BESS | Batteries | Battery | 100 MW | Operating | 2025 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.