Electric generating plantEIA plant no. 57137

Eurus Combine Hills Turbine Ranch 2

Type
Onshore Wind Turbine
Nameplate capacity
66.1 MW
Units
1
In service since
2010
Operator
Eurus Combine Hills II LLC
Location
Milton Freewater, Umatilla County, Oregon
Rated 52nd largest in Oregon · 3586th of 14,761 in the U.S. · by nameplate

Eurus Combine Hills Turbine Ranch 2 is a wind power plant in Oregon with a nameplate capacity of 66.1 MW. It generates roughly 146.1k MWh per year — enough to power about 13,911 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Eurus Combine Hills Turbine Ranch 2 could make 579.0k MWh. In 2023 it made 146.1k MWh — the same as running at full power 25 hours in every 100.

Nameplate, full year579.0k MWh66.1 MW × 8,760 hours
Actually generated146.1k MWhEPA eGRID, 2023 · ≈13,911 homes

Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWind

Location

Address84700 Whitewater Reservoir Rd
CityMilton Freewater
CountyUmatilla County
StateOregon
ZIP97862
Coordinates45.94300, -118.59100
OperatorEurus Combine Hills II LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind66.1 MWOperating2010

Grid context

NERC RegionWECC
Balancing AuthorityBonneville Power Administration

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.