Everett Cogen is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this biomass plant as retired; the last one retired in October 2011. It is not counted among Washington's operating plants or in any ranking on this site.
The figures below describe the plant when it ran: equipment from EIA Form 860 (2025).
The 42.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 2600 Federal Ave |
|---|---|
| City | Everett |
| County | Snohomish County |
| State | Washington |
| ZIP | 98201 |
| Coordinates | 47.97850, -122.22170 |
| Operator | Kimberly-Clark Corp |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Wood/Wood Waste Biomass | Wood/Wood Waste | 42.0 MW | Retired | 1996 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Bonneville Power Administration |
Biomass plants burn wood, agricultural waste, or methane from landfills to generate steam and electricity. They are considered carbon-neutral over long timescales when fuel is sustainably sourced, but they produce particulate emissions similar to coal.