Evonik Industries AG is a oil power plant in Indiana with a nameplate capacity of 1.2 MW. It generates roughly 6 MWh per year — enough to power about 0 average U.S. homes.
Its capacity factor of 0% reflects intermittent or peaking operation. At 2423 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.
Run flat out every hour of the year, Evonik Industries AG could make 10.5k MWh. In 2023 it made 6 MWh — the same as running at full power less than 1 hours in every 100.
Peaking or variableCapacity factor 0%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1650 Lilly Rd |
|---|---|
| City | Lafayette |
| County | Tippecanoe County |
| State | Indiana |
| ZIP | 47909 |
| Coordinates | 40.38724, -86.93914 |
| Operator | Evonik Degussa Corporation |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| T121 | Petroleum Liquids | Distillate Oil | 1.2 MW | Standby | 1992 |
| CO₂ | 7 metric tons |
|---|---|
| CO₂ Rate | 2423 lb/MWh |
Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.
| NERC Region | RFC |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Oil-fired plants typically run only during peak demand or grid emergencies because oil is expensive compared to gas and coal. Per megawatt-hour, they emit nearly as much CO₂ as coal.
| Data center | Distance |
|---|---|
| Agricultural and Biological Engineering | 2.7 mi |
| Learning GIS! | 2.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map