Facebook 1 Solar Energy Center is a solar power plant in New Mexico with a nameplate capacity of 10.0 MW. It generates roughly 26.0k MWh per year — enough to power about 2,472 average U.S. homes.
Its capacity factor of 30% reflects intermittent or peaking operation.
Run flat out every hour of the year, Facebook 1 Solar Energy Center could make 87.6k MWh. In 2023 it made 26.0k MWh — the same as running at full power 30 hours in every 100.
Peaking or variableCapacity factor 30%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1501 Athene Drive |
|---|---|
| City | Los Lunas |
| County | Valencia County |
| State | New Mexico |
| ZIP | 87031 |
| Coordinates | 34.83100, -106.76200 |
| Operator | Exus New Mexico |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| FB1 | Solar Photovoltaic | Solar | 10.0 MW | Operating | 2017 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Public Service Company of New Mexico |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Meta data center, Los Lunas | 1.1 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map