Electric generating plantEIA plant no. 67149

Falmouth 2 Solar

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2021
Operator
Citizens Enterprises Corporation
Location
Falmouth, Barnstable County, Massachusetts
Rated 547th largest in Massachusetts · 12718th of 14,761 in the U.S. · by nameplate

Falmouth 2 Solar is a solar power plant in Massachusetts with a nameplate capacity of 1.5 MW. It generates roughly 2.6k MWh per year — enough to power about 244 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Falmouth 2 Solar could make 13.1k MWh. In 2023 it made 2.6k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated2.6k MWhEPA eGRID, 2023 · ≈244 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Location

Address258 Thomas B Landers Road
CityFalmouth
CountyBarnstable County
StateMassachusetts
ZIP02536
Coordinates41.61100, -70.59700
OperatorCitizens Enterprises Corporation

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar1.5 MWOperating2021

Ownership

OwnerLocationShare
Falmouth Landfill Solar II LLCBoston, MA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Barnstable County

View all plants in Barnstable County →

Explore more