Electric generating plantEIA plant no. 64337

Farmington Solar

Type
Solar Photovoltaic
Nameplate capacity
77.0 MW
Units
1
In service since
2021
Operator
Farmington Solar, LLC
Location
Farmington, Franklin County, Maine
Rated 15th largest in Maine · 3236th of 14,761 in the U.S. · by nameplate

Farmington Solar is a solar power plant in Maine with a nameplate capacity of 77.0 MW. It generates roughly 121.7k MWh per year — enough to power about 11,593 average U.S. homes.

Its capacity factor of 18% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Farmington Solar could make 674.5k MWh. In 2023 it made 121.7k MWh — the same as running at full power 18 hours in every 100.

Nameplate, full year674.5k MWh77.0 MW × 8,760 hours
Actually generated121.7k MWhEPA eGRID, 2023 · ≈11,593 homes

Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolarBiomass

Location

Address362 Farmington Falls Road
CityFarmington
CountyFranklin County
StateMaine
ZIP04938
Coordinates44.65466, -70.10084
OperatorFarmington Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
FNSSolar PhotovoltaicSolar77.0 MWOperating2021

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Franklin County

View all plants in Franklin County →