Firestone Walker Brewery - Phase 1

☀ SolarIPP Non-CHP1 MW capacity

1449th largest plant in California · 11524th nationally

Firestone Walker Brewery - Phase 1 is a solar power plant in California with a nameplate capacity of 1.6 MW. It generates roughly 3.9k MWh per year — enough to power about 370 average U.S. homes.

Its capacity factor of 28% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%28%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.9k MWhEPA eGRID
Capacity Factor28%of theoretical max
Annual CO₂metric tons

Location

Plant NameFirestone Walker Brewery - Phase 1
OperatorSkyhigh 2 Solar
CityPaso Robles
CountySan Luis Obispo County
StateCalifornia
ZIP93446
Coordinates35.59588, -120.69431

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
FWBP1Solar PhotovoltaicSolar1.6 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Luis Obispo County

View all plants in San Luis Obispo County →

Explore more