Folsom Sp And Csp Sacramento

☀ SolarIPP Non-CHP1 MW capacity

1598th largest plant in California · 12185th nationally

Folsom Sp And Csp Sacramento is a solar power plant in California with a nameplate capacity of 1.3 MW. It generates roughly 611 MWh per year — enough to power about 58 average U.S. homes.

Its capacity factor of 5% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%5%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation611 MWhEPA eGRID
Capacity Factor5%of theoretical max
Annual CO₂metric tons

Location

Plant NameFolsom Sp And Csp Sacramento
OperatorEcoplexus, Inc
CityRepresa
CountySacramento County
StateCalifornia
ZIP95671
Coordinates38.68700, -121.16000

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
FOLSMSolar PhotovoltaicSolar1.3 MWOperating2019

Grid context

NERC RegionWECC
Balancing AuthorityBalancing Authority Of Northern California

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.