Foote Creek III is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this wind plant as retired; the last one retired in December 2023. It is not counted among Wyoming's operating plants or in any ranking on this site.
The figures below describe the plant when it ran: equipment from EIA Form 860 (2025), output and emissions from EPA eGRID (2023).
Run flat out every hour of the year, Foote Creek III could make 217.2k MWh. In 2023 it made 14.6k MWh — the same as running at full power 7 hours in every 100.
Capacity factor 7% in 2023, before it retired.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 180 Ex373 N 2mi Rte13 |
|---|---|
| City | McFadden |
| County | Carbon County |
| State | Wyoming |
| ZIP | 82083 |
| Coordinates | 41.66647, -106.18328 |
| Operator | PacifiCorp |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Wind | 24.8 MW | Retired | 1999 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | PacifiCorp - East |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.