Foundation ST is a wind power plant in California with a nameplate capacity of 2.0 MW. It generates roughly 1.8k MWh per year — enough to power about 172 average U.S. homes.
Its capacity factor of 10% reflects intermittent or peaking operation.
Run flat out every hour of the year, Foundation ST could make 17.5k MWh. In 2023 it made 1.8k MWh — the same as running at full power 10 hours in every 100.
Peaking or variableCapacity factor 10%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 16900 W. Schulte Road |
|---|---|
| City | Tracy |
| County | San Joaquin County |
| State | California |
| ZIP | 95377 |
| Coordinates | 37.71417, -121.52167 |
| Operator | Foundation HA Energy Generation, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| WTG1 | Onshore Wind Turbine | Wind | 2.0 MW | Operating | 2011 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.