Electric generating plantEIA plant no. 56392

FPL Energy Oliver Wind I LLC

Type
Onshore Wind Turbine
Nameplate capacity
50.6 MW
Units
1
In service since
2006
Operator
FPL Energy Oliver County Wind
Location
Center, Oliver County, North Dakota
Rated 42nd largest in North Dakota · 3914th of 14,761 in the U.S. · by nameplate

FPL Energy Oliver Wind I LLC is a wind power plant in North Dakota with a nameplate capacity of 50.6 MW. It generates roughly 171.5k MWh per year — enough to power about 16,336 average U.S. homes.

Its capacity factor of 39% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, FPL Energy Oliver Wind I LLC could make 443.3k MWh. In 2023 it made 171.5k MWh — the same as running at full power 39 hours in every 100.

Nameplate, full year443.3k MWh50.6 MW × 8,760 hours
Actually generated171.5k MWhEPA eGRID, 2023 · ≈16,336 homes

Peaking or variableCapacity factor 39%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalWind

Location

Address1851 33rd Avenue
CityCenter
CountyOliver County
StateNorth Dakota
ZIP58530
Coordinates47.15285, -101.19772
OperatorFPL Energy Oliver County Wind

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind50.6 MWOperating2006

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants