Electric generating plantEIA plant no. 65429

FPL Shirer Branch Solar Energy Center

Type
Solar Photovoltaic
Nameplate capacity
149 MW
Units
2
In service since
2023–2025
Operator
Florida Power & Light Co
Location
Clarksville, Calhoun County, Florida
Rated 53rd largest in Florida · 2170th of 14,761 in the U.S. · by nameplate

FPL Shirer Branch Solar Energy Center is a solar power plant in Florida with a nameplate capacity of 149 MW. It generates roughly 136.0k MWh per year — enough to power about 12,954 average U.S. homes.

Its capacity factor of 21% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, FPL Shirer Branch Solar Energy Center could make 652.6k MWh. In 2023 it made 136.0k MWh — the same as running at full power 21 hours in every 100.

Nameplate, full year652.6k MWh74.5 MW × 8,760 hours
Actually generated136.0k MWhEPA eGRID, 2023 · ≈12,954 homes

In 2023 its nameplate was 74.5 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 149 MW operating.

Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address13188 Sw Cr 1
CityClarksville
CountyCalhoun County
StateFlorida
ZIP32466
Coordinates30.39620, -85.27966
OperatorFlorida Power & Light Co

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar74.5 MWOperating2023
2BatteriesBattery74.5 MWOperating2025

Grid context

NERC RegionSERC
Balancing AuthorityFlorida Power & Light Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Calhoun County

View all plants in Calhoun County →

Explore more