Fremont - Kato Rd

☀ SolarIPP Non-CHP1 MW capacity

1572nd largest plant in California · 12057th nationally

Fremont - Kato Rd is a solar power plant in California with a nameplate capacity of 1.4 MW. It generates roughly 2.3k MWh per year — enough to power about 223 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%19%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation2.3k MWhEPA eGRID
Capacity Factor19%of theoretical max
Annual CO₂metric tons

Location

Plant NameFremont - Kato Rd
OperatorTesla Inc.
CityFremont
CountyAlameda County
StateCalifornia
ZIP94538
Coordinates37.47919, -121.93226

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomassBattery Storage

Generators (2)

IDTechnologyFuelCapacityStatusOnline
PV2Solar PhotovoltaicSolar0.9 MWOperating2017
PV1Solar PhotovoltaicSolar0.5 MWOperating2016

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.