Electric generating plantEIA plant no. 60218

Frontier Windpower

Type
Onshore Wind Turbine
Nameplate capacity
200 MW
Units
1
In service since
2016
Operator
Deriva Energy
Location
Newkirk, Kay County, Oklahoma
Rated 49th largest in Oklahoma · 1574th of 14,761 in the U.S. · by nameplate

Frontier Windpower is a wind power plant in Oklahoma with a nameplate capacity of 200 MW. It generates roughly 493.6k MWh per year — enough to power about 47,010 average U.S. homes.

Its capacity factor of 28% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Frontier Windpower could make 1.8M MWh. In 2023 it made 493.6k MWh — the same as running at full power 28 hours in every 100.

Nameplate, full year1.8M MWh200 MW × 8,760 hours
Actually generated493.6k MWhEPA eGRID, 2023 · ≈47,010 homes

Peaking or variableCapacity factor 28%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricWind

Location

Address1100 N Ranch Drive
CityNewkirk
CountyKay County
StateOklahoma
ZIP74647
Coordinates36.83888, -97.18102
OperatorDeriva Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
FC1Onshore Wind TurbineWind200 MWOperating2016

Ownership

OwnerLocationShare
Frontier Windpower, LLCCharlotte, NC10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionMRO
Balancing AuthoritySouthwestern Power Administration

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Kay County

View all plants in Kay County →

Explore more