Ft. Churchill Pv

☀ SolarCommercial Non-CHP19 MW capacity

81st largest plant in Nevada · 4847th nationally

Ft. Churchill Pv is a solar power plant in Nevada with a nameplate capacity of 19.9 MW. It generates roughly 23.7k MWh per year — enough to power about 2,257 average U.S. homes.

Its capacity factor of 14% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%14%
Peaking — intermittent or backup
Capacity20 MWnameplate
Annual Generation23.7k MWhEPA eGRID
Capacity Factor14%of theoretical max
Annual CO₂metric tons

Location

Plant NameFt. Churchill Pv
OperatorSierra Pacific Power Co
CityYerington
CountyLyon County
StateNevada
ZIP89447
Coordinates39.12806, -119.14000

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarGeothermal

Generators (1)

IDTechnologyFuelCapacityStatusOnline
NVC7Solar PhotovoltaicSolar19.9 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Lyon County

View all plants in Lyon County →

Explore more