Gaia Hybrid

☀ SolarIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameGaia Hybrid
OperatorSunraycer Assets I Llc
CityNavarro
CountyNavarro County
StateTexas
ZIP75110
Coordinates32.16077, -96.19527

Generators (2)

IDTechnologyFuelCapacityStatusOnline
GAIASSolar PhotovoltaicSolar153 MWPlanned
GAIABBatteriesBattery76.8 MWPlanned

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council Of Texas, Inc.

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.