Gcc Trident Solar Project

☀ SolarIndustrial Non-CHP2 MW capacity

65th largest plant in Montana · 10231st nationally

Gcc Trident Solar Project is a solar power plant in Montana with a nameplate capacity of 2.0 MW.

Capacity2 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameGcc Trident Solar Project
OperatorGcc Trident Llc
CityThree Forks
CountyGallatin County
StateMontana
ZIP59752
Coordinates45.93728, -111.46373

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolar

Generators (2)

IDTechnologyFuelCapacityStatusOnline
GCC1Solar PhotovoltaicSolar2.0 MWOperating2022
GCC2Solar PhotovoltaicSolar2.0 MWUnder Construction

Grid context

NERC RegionWECC
Balancing AuthorityNorthwestern Energy (Nwmt)

About Solar plants