Electric generating plantEIA plant no. 68260

GCC Trident Solar Project

Type
Solar Photovoltaic
Nameplate capacity
4.0 MW
Units
2
In service since
2022–2025
Operator
GCC Trident LLC
Location
Three Forks, Gallatin County, Montana
Rated 60th largest in Montana · 9069th of 14,761 in the U.S. · by nameplate

GCC Trident Solar Project is a solar power plant in Montana with a nameplate capacity of 4.0 MW.

The 4.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolar

Location

Address4070 Trident Rd
CityThree Forks
CountyGallatin County
StateMontana
ZIP59752
Coordinates45.93728, -111.46373
OperatorGCC Trident LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
GCC1Solar PhotovoltaicSolar2.0 MWOperating2022
GCC2Solar PhotovoltaicSolar2.0 MWOperating2025

Grid context

NERC RegionWECC
Balancing AuthorityNorthWestern Energy (NWMT)

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Explore more