Electric generating plantEIA plant no. 59841

General Motors Corp at White Marsh MD

Type
Solar Photovoltaic
Status
Retired May 2021
Nameplate (when running)
1.0 MW
Units
1
In service since
2011
Operator
Luminace Solar Maryland, LLC
Location
White Marsh, Baltimore County, Maryland

General Motors Corp at White Marsh MD is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this solar plant as retired; the last one retired in May 2021. It is not counted among Maryland's operating plants or in any ranking on this site.

The figures below describe the plant when it ran: equipment from EIA Form 860 (2025).

The 1.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address10301 Philadelphia Rd
CityWhite Marsh
CountyBaltimore County
StateMaryland
ZIP21162
Coordinates39.37160, -76.44050
OperatorLuminace Solar Maryland, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar1.0 MWRetired2011

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Baltimore County

View all plants in Baltimore County →

Explore more