Electric generating plantEIA plant no. 54751

Genesee Power Station LP

Type
Wood/Wood Waste Biomass
Nameplate capacity
39.5 MW
Units
1
In service since
1995
Operator
NorthStar Clean Energy
Location
Flint, Genesee County, Michigan
Rated 98th largest in Michigan · 4315th of 14,761 in the U.S. · by nameplate

Genesee Power Station LP is a biomass power plant in Michigan with a nameplate capacity of 39.5 MW. It generates roughly 114.8k MWh per year — enough to power about 10,930 average U.S. homes.

Its capacity factor of 33% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Genesee Power Station LP could make 346.0k MWh. In 2023 it made 114.8k MWh — the same as running at full power 33 hours in every 100.

Nameplate, full year346.0k MWh39.5 MW × 8,760 hours
Actually generated114.8k MWhEPA eGRID, 2023 · ≈10,930 homes

Peaking or variableCapacity factor 33%. It runs only part of the time — when demand is high, or when the wind or sun allows.

Month by month in 2025

100% of nameplate0Jan: 10.2k MWh (35% of capacity)JFeb: 9.9k MWh (37% of capacity)FMar: 10.1k MWh (34% of capacity)MApr: 5.4k MWh (19% of capacity)AMay: 9.6k MWh (32% of capacity)MJun: 8.5k MWh (30% of capacity)JJul: 10.4k MWh (35% of capacity)JAug: 9.2k MWh (31% of capacity)ASep: 10.6k MWh (37% of capacity)SOct: 9.3k MWh (32% of capacity)ONov: 10.5k MWh (37% of capacity)NDec: 12.9k MWh (44% of capacity)D

Pale bars are each month's ceiling (39.5 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923.

How it works

A steam plant burning wood

wood insteamwater returns1boiler burns wood2steam spins turbine3generator4cooling condenses steam
  1. A boiler burns wood to turn water into high-pressure steam.
  2. The steam pushes through a turbine, spinning it thousands of times a minute.
  3. The turbine's shaft turns a generator, which sends power to the grid.
  4. Spent steam is cooled back into water — by a cooling tower, a lake or a river — and pumped back to the boiler.

Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomass

Location

Address5310 N Dort Hwy
CityFlint
CountyGenesee County
StateMichigan
ZIP48505
Coordinates43.08511, -83.66939
OperatorNorthStar Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Wood/Wood Waste BiomassWood/Wood Waste39.5 MWOperating1995

Ownership

OwnerLocationShare
Genesee Power Partners LPJackson, MI4975.0%
CMS Generation Holdings CoJackson, MI4875.0%
CMS Generation Genesee CoJackson, MI100.0%
Gps Newco LLCJackson, MI50.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Emissions (annual)

SO₂78 metric tons
NOₓ179 metric tons

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Biomass plants

Biomass plants burn wood, agricultural waste, or methane from landfills to generate steam and electricity. They are considered carbon-neutral over long timescales when fuel is sustainably sourced, but they produce particulate emissions similar to coal.

Other plants in Genesee County

View all plants in Genesee County →

Data centers near Genesee Power Station LP

Data centerOperatorDistance
Data center, 5225 Exchange Drive, FlintNot recorded9.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more