Iron, Utah · Plant code 59945

Granite Mountain Solar West, LLC

Granite Mountain Solar West, LLC is a solar plant in Iron, Utah. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 50 MW

Plant nameplate capacity.

Annual generation 128,188 MWh

Annual output from imported EIA and EPA records.

Capacity factor 27%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,016

Useful for technology-vintage context.

Location Cedar City, Utah

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 128,188 MWh · 100% of generation

Ownership

Who owns the plant.

Owner Clearway Energy, Inc

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
GMSW Solar Photovoltaic Solar 50 MW Operating 2,016

Generation trend

Monthly output pattern

5,392 MWh
Jan
6,916 MWh
Feb
9,834 MWh
Mar
13,117 MWh
Apr
15,590 MWh
May
15,714 MWh
Jun
13,584 MWh
Jul
13,723 MWh
Aug
11,515 MWh
Sep
9,567 MWh
Oct
6,939 MWh
Nov
6,297 MWh
Dec

Nearby plants

Closest comparison sites

Iron, Utah

Fiddler's Canyon #2

Solar

Fiddler's Canyon #2 is a solar plant in Iron, Utah. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 7,434 MWh 0 tons CO2
SunE Solar XVII Project 2, LLC 2.1 mi away

Iron, Utah

Fiddler's Canyon #1

Solar

Fiddler's Canyon #1 is a solar plant in Iron, Utah. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 7,313 MWh 0 tons CO2
SunE Solar XVII Project 1, LLC 5.0 mi away

Granite Mountain Solar East, LLC is a solar plant in Iron, Utah. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

80 MW 210,979 MWh 0 tons CO2
Clearway Energy, Inc 5.5 mi away

Iron, Utah

Fiddler's Canyon 3

Solar

Fiddler's Canyon 3 is a solar plant in Iron, Utah. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

3 MW 7,491 MWh 0 tons CO2
SunE Solar XVII Project 3, LLC 7.4 mi away

Related routes

Context around this plant