Electric generating plantEIA plant no. 67046

Grimes County Solar

Type
Solar Photovoltaic
Nameplate capacity
210 MW
Units
1
Operator
Grimes County Solar Project, LLC
Location
Lola, Grimes County, Texas
Rated 274th largest in Texas · 1457th of 14,017 in the U.S. · by nameplate

Grimes County Solar is a solar power plant in Texas with a nameplate capacity of 210 MW.

The 210 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

AddressTbd
CityLola
CountyGrimes County
StateTexas
ZIP77861
Coordinates30.65119, -96.09134
OperatorGrimes County Solar Project, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GS1Solar PhotovoltaicSolar210 MWUnder Construction—

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Grimes County

View all plants in Grimes County →

Explore more