Gulf Power Blue Indigo Energy is a solar power plant in Florida with a nameplate capacity of 74.5 MW. It generates roughly 140.2k MWh per year — enough to power about 13,352 average U.S. homes.
Its capacity factor of 21% reflects intermittent or peaking operation.
Run flat out every hour of the year, Gulf Power Blue Indigo Energy could make 652.6k MWh. In 2023 it made 140.2k MWh — the same as running at full power 21 hours in every 100.
Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 4360 Jackson Road |
|---|---|
| City | Cottondale |
| County | Jackson County |
| State | Florida |
| ZIP | 32431 |
| Coordinates | 30.87726, -85.40065 |
| Operator | Florida Power & Light Co |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| SBI01 | Solar Photovoltaic | Solar | 74.5 MW | Operating | 2020 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Florida Power & Light Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| AngelTrax Data Center | 24.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map