Gutenberg Solar

☀ SolarElectric Utility79 MW capacity

51st largest plant in North Carolina · 2877th nationally

Gutenberg Solar is a solar power plant in North Carolina with a nameplate capacity of 79.9 MW. It generates roughly 141.0k MWh per year — enough to power about 13,429 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%20%
Peaking — intermittent or backup
Capacity80 MWnameplate
Annual Generation141.0k MWhEPA eGRID
Capacity Factor20%of theoretical max
Annual CO₂metric tons

Location

Plant NameGutenberg Solar
OperatorDominion Energy Inc.
CityGarysburg
CountyNorthampton County
StateNorth Carolina
ZIP27831
Coordinates36.48643, -77.53482

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilHydroelectricSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GUTNSolar PhotovoltaicSolar79.9 MWOperating2019

Grid context

NERC RegionSERC
Balancing AuthorityPjm Interconnection, Llc

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Northampton County

View all plants in Northampton County →

Explore more