Harris (NC) is a nuclear power plant in North Carolina with a nameplate capacity of 951 MW. It generates roughly 8.6M MWh per year — enough to power about 819,931 average U.S. homes.
Its capacity factor of 103% means it runs nearly around-the-clock as baseload generation.
Harris (NC) reported making more than its nameplate allows (103%). That can't happen in physics — here's what a number over 100% usually means.
BaseloadCapacity factor 103%. It runs nearly around the clock.
How it works
Why the numbers look like this: reactors run at full power for 18 to 24 months between refuelings, which is why U.S. nuclear plants routinely post capacity factors above 90% — the highest of any kind of plant.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | P. O. Box 165 |
|---|---|
| City | New Hill |
| County | Wake County |
| State | North Carolina |
| ZIP | 27562 |
| Coordinates | 35.63340, -78.95560 |
| Operator | Duke Energy Progress - (NC) |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Nuclear | Uranium | 951 MW | Operating | 1987 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Progress East |
Nuclear plants generate carbon-free baseload electricity by fissioning uranium fuel inside a reactor. They run nearly around-the-clock — typical capacity factors above 90% — and a single facility can power millions of homes. Spent fuel is stored on-site in dry casks. NRC oversees safety; emergency planning zones extend 10 miles from the reactor.
| Data center | Distance |
|---|---|
| iGLASS Networks | 13.3 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map