Electric generating plantEIA plant no. 55816

Hawkeye Power Partners LLC

Type
Onshore Wind Turbine
Nameplate capacity
42.0 MW
Units
1
In service since
1999
Operator
Hawkeye Power Partners LLC
Location
Garner, Cerro Gordo County, Iowa
Rated 110th largest in Iowa · 4217th of 14,761 in the U.S. · by nameplate

Hawkeye Power Partners LLC is a wind power plant in Iowa with a nameplate capacity of 42.0 MW. It generates roughly 166.1k MWh per year — enough to power about 15,818 average U.S. homes.

Its capacity factor of 45% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Hawkeye Power Partners LLC could make 367.9k MWh. In 2023 it made 166.1k MWh — the same as running at full power 45 hours in every 100.

Nameplate, full year367.9k MWh42.0 MW × 8,760 hours
Actually generated166.1k MWhEPA eGRID, 2023 · ≈15,818 homes

Mid-meritCapacity factor 45%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBiomass

Location

Address1824 200th Street
CityGarner
CountyCerro Gordo County
StateIowa
ZIP50438
Coordinates43.04722, -93.47750
OperatorHawkeye Power Partners LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
48MOnshore Wind TurbineWind42.0 MWOperating1999

Ownership

OwnerLocationShare
Shaw Creek SolarJuno Beach, FL10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Cerro Gordo County

View all plants in Cerro Gordo County →

Explore more