☀ SolarIPP Non-CHP20 MW capacity

96th largest plant in Virginia · 4596th nationally

Hecate Energy Cherrydale Llc is a solar power plant in Virginia with a nameplate capacity of 20.0 MW. It generates roughly 30.6k MWh per year — enough to power about 2,916 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%17%
Peaking — intermittent or backup
Capacity20 MWnameplate
Annual Generation30.6k MWhEPA eGRID
Capacity Factor17%of theoretical max
Annual CO₂metric tons

Location

Plant NameHecate Energy Cherrydale Llc
OperatorDominion Renewable Energy
CityCape Charles
CountyNorthampton County
StateVirginia
ZIP23310
Coordinates37.37000, -75.91717

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar20.0 MWOperating2017

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc