Electric generating plantEIA plant no. 60099

Hewlett-Packard (HP) - Andover, MA

Type
Solar Photovoltaic
Nameplate capacity
1.7 MW
Units
1
In service since
2017
Operator
Tesla Inc.
Location
Andover, Essex County, Massachusetts
Rated 531st largest in Massachusetts · 12458th of 14,761 in the U.S. · by nameplate

Hewlett-Packard (HP) - Andover, MA is a solar power plant in Massachusetts with a nameplate capacity of 1.7 MW. It generates roughly 1.1k MWh per year — enough to power about 100 average U.S. homes.

Its capacity factor of 7% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Hewlett-Packard (HP) - Andover, MA could make 14.9k MWh. In 2023 it made 1.1k MWh — the same as running at full power 7 hours in every 100.

Nameplate, full year14.9k MWh1.7 MW × 8,760 hours
Actually generated1.1k MWhEPA eGRID, 2023 · ≈100 homes

Peaking or variableCapacity factor 7%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Location

Address165 Dascomb Rd
CityAndover
CountyEssex County
StateMassachusetts
ZIP01810
Coordinates42.62469, -71.18291
OperatorTesla Inc.

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar1.7 MWOperating2017

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Essex County

View all plants in Essex County →

Data centers near Hewlett-Packard (HP) - Andover, MA

Data centerOperatorDistance
TierPoint data center, 15 Shattuck Road, AndoverTierPoint4.4 mi
Markley Data CenterMarkley Group6.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more