Highlander Solar Energy Station 1 is a solar power plant in Virginia with a nameplate capacity of 165 MW. It generates roughly 299.6k MWh per year — enough to power about 28,533 average U.S. homes.
Its capacity factor of 21% reflects intermittent or peaking operation.
Run flat out every hour of the year, Highlander Solar Energy Station 1 could make 1.4M MWh. In 2023 it made 299.6k MWh — the same as running at full power 21 hours in every 100.
Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | Tbd |
|---|---|
| City | Spotsylvania |
| County | Spotsylvania County |
| State | Virginia |
| ZIP | 22551 |
| Coordinates | 38.24712, -77.78622 |
| Operator | AES Distributed Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| HLND1 | Solar Photovoltaic | Solar | 165 MW | Operating | 2020 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Equinix CU2 | 17.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map