Electric generating plantEIA plant no. 60008

Hooper Solar

Type
Solar Photovoltaic
Nameplate capacity
52.0 MW
Units
1
In service since
2015
Operator
Solar Star Colorado III, LLC
Location
Mosca, Alamosa County, Colorado
Rated 80th largest in Colorado · 3876th of 14,761 in the U.S. · by nameplate

Hooper Solar is a solar power plant in Colorado with a nameplate capacity of 52.0 MW. It generates roughly 118.3k MWh per year — enough to power about 11,264 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Hooper Solar could make 455.5k MWh. In 2023 it made 118.3k MWh — the same as running at full power 26 hours in every 100.

Nameplate, full year455.5k MWh52.0 MW × 8,760 hours
Actually generated118.3k MWhEPA eGRID, 2023 · ≈11,264 homes

Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilSolar

Location

Address2555 Lane 8 North
CityMosca
CountyAlamosa County
StateColorado
ZIP81146
Coordinates37.69186, -105.99081
OperatorSolar Star Colorado III, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SCCO3Solar PhotovoltaicSolar52.0 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado