Hoosier Wind Project LLC is a wind power plant in Indiana with a nameplate capacity of 106 MW. It generates roughly 207.8k MWh per year — enough to power about 19,794 average U.S. homes.
Its capacity factor of 22% reflects intermittent or peaking operation.
Run flat out every hour of the year, Hoosier Wind Project LLC could make 928.6k MWh. In 2023 it made 207.8k MWh — the same as running at full power 22 hours in every 100.
Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3200 E 900th N |
|---|---|
| City | Goodland |
| County | Benton County |
| State | Indiana |
| ZIP | 47948 |
| Coordinates | 40.71780, -87.26310 |
| Operator | AES Indiana |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| TBD | Onshore Wind Turbine | Wind | 106 MW | Operating | 2009 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.