Electric generating plantEIA plant no. 62795

Ida Grove II

Type
Onshore Wind Turbine
Nameplate capacity
201 MW
Units
1
In service since
2019
Operator
MidAmerican Energy Co
Location
Ida Grove, Ida County, Iowa
Rated 38th largest in Iowa · 1551st of 14,761 in the U.S. · by nameplate

Ida Grove II is a wind power plant in Iowa with a nameplate capacity of 201 MW. It generates roughly 647.2k MWh per year — enough to power about 61,637 average U.S. homes.

Its capacity factor of 37% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Ida Grove II could make 1.8M MWh. In 2023 it made 647.2k MWh — the same as running at full power 37 hours in every 100.

Nameplate, full year1.8M MWh201 MW × 8,760 hours
Actually generated647.2k MWhEPA eGRID, 2023 · ≈61,637 homes

Peaking or variableCapacity factor 37%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilWind

Location

Address2552 Keystone Ave
CityIda Grove
CountyIda County
StateIowa
ZIP51445
Coordinates42.32685, -95.45882
OperatorMidAmerican Energy Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind201 MWOperating2019

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..