Pender, North Carolina · Plant code 59678

Innovative Solar 67

Innovative Solar 67 is a solar plant in Pender, North Carolina. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 33 MW

Plant nameplate capacity.

Annual generation 67,120 MWh

Annual output from imported EIA and EPA records.

Capacity factor 24%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,018

Useful for technology-vintage context.

Location Willard, North Carolina

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 67,120 MWh · 100% of generation

Ownership

Who owns the plant.

Owner John Laing US Solar Corp.

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
IS067 Solar Photovoltaic Solar 33 MW Operating 2,018

Generation trend

Monthly output pattern

4,011 MWh
Jan
4,677 MWh
Feb
5,999 MWh
Mar
6,886 MWh
Apr
7,154 MWh
May
8,043 MWh
Jun
6,810 MWh
Jul
6,328 MWh
Aug
4,825 MWh
Sep
5,514 MWh
Oct
3,560 MWh
Nov
3,313 MWh
Dec

Nearby plants

Closest comparison sites

Pender, North Carolina

Crooked Run

Solar

Crooked Run is a solar plant in Pender, North Carolina. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

70 MW 139,727 MWh 0 tons CO2
Cubico USA, LLC 4.0 mi away

Pender, North Carolina

Bearford Solar II

Solar

Bearford Solar II is a solar plant in Pender, North Carolina. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 7,696 MWh 0 tons CO2
Bearford Solar II, LLC 4.4 mi away

Pender, North Carolina

Bearford Farm Solar Project

Solar

Bearford Farm Solar Project is a solar plant in Pender, North Carolina. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 9,525 MWh 0 tons CO2
Bearford Farm, LLC 4.7 mi away

Pender, North Carolina

Willard Solar

Solar

Willard Solar is a solar plant in Pender, North Carolina. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

5 MW 8,537 MWh 0 tons CO2
New Energy Solar 5.8 mi away

Related routes

Context around this plant