Jackson County Solar, LLC is a solar power plant in Michigan with a nameplate capacity of 125 MW.
The 125 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3324 Callahan Road |
|---|---|
| City | Albion |
| County | Jackson County |
| State | Michigan |
| ZIP | 49224 |
| Coordinates | 42.28192, -84.65668 |
| Operator | Geronimo Power |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| JCKSN | Solar Photovoltaic | Solar | 125 MW | Under Construction | — |
| NERC Region | RFC |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.