Electric generating plantEIA plant no. 65965

Java Solar, LLC

Type
Solar Photovoltaic
Nameplate capacity
13.5 MW
Units
1
In service since
2022
Operator
Java Solar, LLC
Location
Lemoore, Kings County, California
Rated 789th largest in California · 5674th of 14,761 in the U.S. · by nameplate

Java Solar, LLC is a solar power plant in California with a nameplate capacity of 13.5 MW. It generates roughly 28.6k MWh per year — enough to power about 2,726 average U.S. homes.

Its capacity factor of 24% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Java Solar, LLC could make 118.3k MWh. In 2023 it made 28.6k MWh — the same as running at full power 24 hours in every 100.

Nameplate, full year118.3k MWh13.5 MW × 8,760 hours
Actually generated28.6k MWhEPA eGRID, 2023 · ≈2,726 homes

Peaking or variableCapacity factor 24%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address16741 20th Ave
CityLemoore
CountyKings County
StateCalifornia
ZIP93245
Coordinates36.23352, -119.81634
OperatorJava Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
JAVASolar PhotovoltaicSolar13.5 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Kings County

View all plants in Kings County →

Explore more