Electric generating plantEIA plant no. 63998

Jennings Energy Storage Facility

Type
Other Fossil
Nameplate capacity
5.5 MW
Units
1
In service since
2022
Operator
Duke Energy Florida, LLC
Location
Jennings, Hamilton County, Florida
Rated 303rd largest in Florida · 7316th of 14,761 in the U.S. · by nameplate

Jennings Energy Storage Facility is a other fossil power plant in Florida with a nameplate capacity of 5.5 MW.

The 5.5 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomassBattery Storage

Location

Address1149 Florida St.
CityJennings
CountyHamilton County
StateFlorida
ZIP32053
Coordinates30.60383, -83.09806
OperatorDuke Energy Florida, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ES1BatteriesBattery5.5 MWOperating2022

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Florida Inc

About Other Fossil plants

Jennings Energy Storage Facility is a federally registered power generation facility in Florida.

Other plants in Hamilton County

View all plants in Hamilton County →