Electric generating plantEIA plant no. 59070

Jericho Power

Type
Onshore Wind Turbine
Nameplate capacity
14.3 MW
Units
1
In service since
2016
Operator
Jericho Power LLC
Location
Berlin, Coos County, New Hampshire
Rated 24th largest in New Hampshire · 5616th of 14,761 in the U.S. · by nameplate

Jericho Power is a wind power plant in New Hampshire with a nameplate capacity of 14.3 MW. It generates roughly 11.9k MWh per year — enough to power about 1,129 average U.S. homes.

Its capacity factor of 9% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Jericho Power could make 125.3k MWh. In 2023 it made 11.9k MWh — the same as running at full power 9 hours in every 100.

Nameplate, full year125.3k MWh14.3 MW × 8,760 hours
Actually generated11.9k MWhEPA eGRID, 2023 · ≈1,129 homes

Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilHydroelectricWindSolarBiomass

Location

Address95 Bathtub Trail
CityBerlin
CountyCoos County
StateNew Hampshire
ZIP03570
Coordinates44.46694, -71.22500
OperatorJericho Power LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WT 1Onshore Wind TurbineWind14.3 MWOperating2016

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Coos County