Jvr Energy Park Llc

☀ SolarIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameJvr Energy Park Llc
OperatorJvr Energy Park Llc
CityJacumba Hot Springs
CountySan Diego County
StateCalifornia
ZIP91934
Coordinates32.62590, -116.17489

Generators (2)

IDTechnologyFuelCapacityStatusOnline
JVR1ASolar PhotovoltaicSolar90.0 MWApproved
JVR1BBatteriesBattery70.0 MWPlanned

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Diego County