Electric generating plantEIA plant no. 65950

Kearsarge 100 Sohier Rd

Type
Solar Photovoltaic
Nameplate capacity
3.8 MW
Units
2
In service since
2023
Operator
Kearsarge Beverly LLC
Location
Beverly, Essex County, Massachusetts
Rated 250th largest in Massachusetts · 9376th of 14,761 in the U.S. · by nameplate

Kearsarge 100 Sohier Rd is a solar power plant in Massachusetts with a nameplate capacity of 3.8 MW. It generates roughly 3.1k MWh per year — enough to power about 294 average U.S. homes.

Its capacity factor of 9% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Kearsarge 100 Sohier Rd could make 33.3k MWh. In 2023 it made 3.1k MWh — the same as running at full power 9 hours in every 100.

Nameplate, full year33.3k MWh3.8 MW × 8,760 hours
Actually generated3.1k MWhEPA eGRID, 2023 · ≈294 homes

Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBiomassBattery Storage

Location

Address100 Sohier Rd
CityBeverly
CountyEssex County
StateMassachusetts
ZIP01915
Coordinates42.56465, -70.88105
OperatorKearsarge Beverly LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
SOHSolar PhotovoltaicSolar2.0 MWOperating2023
SOBATBatteriesBattery1.8 MWOperating2023

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Essex County