Lakeland Electric Co. (Fl)-Airport 1

☀ SolarIPP Non-CHP2 MW capacity

291st largest plant in Florida · 9978th nationally

Lakeland Electric Co. (Fl)-Airport 1 is a solar power plant in Florida with a nameplate capacity of 2.3 MW. It generates roughly 2.0k MWh per year — enough to power about 187 average U.S. homes.

Its capacity factor of 10% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%10%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation2.0k MWhEPA eGRID
Capacity Factor10%of theoretical max
Annual CO₂metric tons

Location

Plant NameLakeland Electric Co. (Fl)-Airport 1
OperatorSune W12dg-B, Llc
CityLakeland
CountyPolk County
StateFlorida
ZIP33811
Coordinates27.98852, -82.04730

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
1Solar PhotovoltaicSolar2.3 MWOperating2011

Grid context

NERC RegionSERC
Balancing AuthorityTampa Electric Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Polk County

View all plants in Polk County →

Explore more