Landrace Holdings, LLC is a solar power plant in South Carolina with a nameplate capacity of 55.0 MW. It generates roughly 11.8k MWh per year — enough to power about 1,124 average U.S. homes.
Its capacity factor of 2% reflects intermittent or peaking operation.
Run flat out every hour of the year, Landrace Holdings, LLC could make 481.8k MWh. In 2023 it made 11.8k MWh — the same as running at full power 2 hours in every 100.
Peaking or variableCapacity factor 2%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | Hwy 701 and Winburn Rd |
|---|---|
| City | Conway |
| County | Horry County |
| State | South Carolina |
| ZIP | 29527 |
| Coordinates | 33.72394, -79.09200 |
| Operator | Landrace Holdings, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| LANDR | Solar Photovoltaic | Solar | 55.0 MW | Operating | 2023 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | South Carolina Public Service Authority |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| DC BLOX Myrtle Beach Cable Landing Station | 9.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map