Electric generating plantEIA plant no. 60142

Lemoore 1

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2016
Operator
AES Distributed Energy
Location
Lemoore, Kings County, California
Rated 1542nd largest in California · 12718th of 14,761 in the U.S. · by nameplate

Lemoore 1 is a solar power plant in California with a nameplate capacity of 1.5 MW. It generates roughly 232 MWh per year — enough to power about 22 average U.S. homes.

Its capacity factor of 2% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Lemoore 1 could make 13.1k MWh. In 2023 it made 232 MWh — the same as running at full power 2 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated232 MWhEPA eGRID, 2023 · ≈22 homes

Peaking or variableCapacity factor 2%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address14805A 19th Ave
CityLemoore
CountyKings County
StateCalifornia
ZIP93245
Coordinates36.25794, -119.79814
OperatorAES Distributed Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
LEPV1Solar PhotovoltaicSolar1.5 MWOperating2016

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator