Lemoore West

☀ SolarIndustrial Non-CHP7 MW capacity

871st largest plant in California · 6283rd nationally

Lemoore West is a solar power plant in California with a nameplate capacity of 7.9 MW.

Capacity8 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameLemoore West
OperatorLeprino Foods
CityLemoore
CountyKings County
StateCalifornia
ZIP93245
Coordinates36.30018, -119.82142

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
LEW1Solar PhotovoltaicSolar7.9 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.