Little Bear 4

☀ SolarIPP Non-CHP50 MW capacity

399th largest plant in California · 3575th nationally

Little Bear 4 is a solar power plant in California with a nameplate capacity of 50.0 MW. It generates roughly 60.3k MWh per year — enough to power about 5,745 average U.S. homes.

Its capacity factor of 14% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%14%
Peaking — intermittent or backup
Capacity50 MWnameplate
Annual Generation60.3k MWhEPA eGRID
Capacity Factor14%of theoretical max
Annual CO₂metric tons

Location

Plant NameLittle Bear 4
OperatorLittle Bear Solar 4, Llc (Longroad)
CityMendota
CountyFresno County
StateCalifornia
ZIP93640
Coordinates36.71600, -120.41500

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
GEN01Solar PhotovoltaicSolar50.0 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator